The contractor is preparing to excavate a storm sewer trench at a commercial development. The grading plan shows the proposed elevations, the drainage drawings show the pipe route, and the utility plan identifies an existing water main. Everything appears ready until a coordination review reveals that the storm sewer crosses the water main at an elevation that leaves insufficient clearance.
The...